Wisen Vision Unit User Manual Download Page 11

Wisen Innovation Technical Doc. No.2021                                           

                                                                                                                            WiSen® Vision Unit - User Manual

 

  www.wisencn.com         

                 

Page - 11 - of 12 

i.

 

Case One: If any change has been made from the list above, please inspect the data from the remote server; 

ii.

 

Case  Two:  If  all  the  actions  from  the  list  above  have  not  cured  the  problem,  please  contact  Wisen.  We  will  be 

happy to help. 

7. Package and Accessories 

Standard

 

No. 

Items 

Dimension (mm) 

Qty. 

Vision Unit   

180x140x60 

4G Antenna 

200 

Cap-Hex-Head Screw 

M6x14 

User Manual* 

Downloadable from Wisen 

Visualisation Platform. 

Inspection Report* 

 

8. Safety and Warning 

Warning: Please read the following instructions carefully. 

1

Operation Safety 

 

Before  taking  any  action,  please  read  all  the  information  provided  carefully,  and  keep  the  guidance  documents 

safe; 

 

Ensure  that  any  procedures  and  installations  are  correctly  carried  out.  The  communication  cable  and  the  case 

must be grounded. 

 

This product has been designed to meet a certain water-proof level. However, it becomes water vulnerable when 

the lid is open or if the cable gland has not been sealed properly. 

2

Electric Safety 

 

To install the battery into a holder, please follow the “+” (positive) and “

-

” (negative) signs in any Wisen product. 

Summary of Contents for Vision Unit

Page 1: ...Wisen Innovation Technical Doc No 2021 WiSen Vision Unit User Manual www wisencn com Page 1 of 12 WiSen Vision Unit User Manual Wuxi Wisen Innovation Co Ltd July 2021 ...

Page 2: ... Vision Unit is deployed at Control centre Data centre the LED warnings can be configured with one or more projects So that a visual and auditory warning system can be established in the centre This frees the operators from frequent checking of warning emails When a Vision Unit is deployed at Control centre Data centre the LED warnings can be configured with one or more projects So that a visual a...

Page 3: ...1 Product Introduction 4 2 System Structure Layout 5 3 Node Radio Features 6 4 Terminologies 8 5 Operation Procedures 9 5 1 System Deployment Notifications 9 5 2 Deployment Procedures 9 5 3 Mounting Options 10 6 General Maintenance and Notification 10 7 Package and Accessories 11 8 Safety and Warning 11 9 Contact 12 ...

Page 4: ...system Our product has IP66 and is designed to work in a tough environment It is small in size reliable in performance easy for maintenance has high precision during sampling and has strong immunity to radio interference Figure 1 Vision Unit Overview Note Vision Unit relies on a stable 4G connection so its image data can be transferred smoothly and furthermore the LED warnings can be received from...

Page 5: ...Wisen Innovation Technical Doc No 2021 WiSen Vision Unit User Manual www wisencn com Page 5 of 12 2 System Structure Layout Figure 2 System Structure Layout ...

Page 6: ...sive Mode Battery Life Photo is not taken until a Photo Taken command is sent more specifically At T 5min a photo comes back at close to real time internal battery life 10 days At T 5min a photo comes back with a delay of 1 2Ts internal battery life 44 days T 5min Active Mode Battery Life 4G Connection Photo is automatically taken at every T Sampling Time Interval T No 1min 3d 5min Default Setting...

Page 7: ...zer Warning the highest warning level Twice at every 2s Blue Buzzer Warning Once at every 3s Green Low Power Green Mode normal level No Buzzer Once at every 4s External Interface Wireless Module ONLY Wisen 7600E or plus Daughter Board Micro SIM card WiFi module Wired Port RS232 Ethernet module WSN Interface Mesh Wireless Interface WiSen Protocol Standard System Parameter Temperature Range 40 to 85...

Page 8: ...novation Technical Doc No 2021 WiSen Vision Unit User Manual www wisencn com Page 8 of 12 4 Terminologies Figure 3 4 Channel Laser Distance Sensor Node Internal Configuration Terminologies where No Terminology ...

Page 9: ...orded against their site references 4 All the node should have its antenna point upwards downwards 5 2 Deployment Procedures 1 Open the box Take the node out of the package and open its lid 2 Insert Battery By default a unit does not contain a D Cell battery Therefore the battery needs to be inserted Notice ve and ve orientation must be correct otherwise the internal circuit may be damaged 3 Anten...

Page 10: ...om units are shown unexpected results or are not being sent back then please carry out investigation using the following two stage procedure A Remote Inspection of historical data to identify the following a Whether the heart beat message has been sent back successfully at each time interval b Whether the battery voltage is too low if yes please change the battery unit c Whether the 4G signal stre...

Page 11: ...ble from Wisen Visualisation Platform 7 Inspection Report 8 Safety and Warning Warning Please read the following instructions carefully 1 Operation Safety Before taking any action please read all the information provided carefully and keep the guidance documents safe Ensure that any procedures and installations are correctly carried out The communication cable and the case must be grounded This pr...

Page 12: ...so please take special care during storage and usage This product must not be disassembled under any circumstances to do so will void the warranty and may leave the product in a dangerous state If all the above are not followed the manufacturer cannot be held responsible for any damage and injury caused to the users 4 Caution Danger of explosion if battery is incorrectly replaced Replace only with...

Reviews: