WPC 2000 User Manual
1128500
Installation
2-15
Making Wiring Connections
To wire a pre-wired Operator Station, perform the following steps:
1.
Punch a hole in the Operator Station enclosure for conduit or sealtight.
2.
Connect the conduit or sealtight to the hole; then open the Operator Station box.
Figure 2-8. Pre-wired Operator Station with Side Run Buttons: Mounting Dimensions
Figure 2-9. Pre-wired Operator Station with Top Run Buttons: Mounting Dimensions
MUTE
PALM
TIME
PRIOR
ACT
INTRISS
W
TOP
STOP
5.8
(148)
REF
4.69
(119.1)
16.75
(425.5)
R
U
N
/
I
N
C
H
R
U
N
/
I
N
C
H
5.50
(139.7)
21.25
(539.8)
Dimensions:
inches
(mm)
E
M
ERGENC
Y
S T O P
6.06
(154.0)
MUTE
PALM
TIME
PRIOR
ACT
INTRISS
W
TOP
STOP
16.75
(425.5)
28.75
(730.3)
5.50
(139.7)
4.69
(119.1)
E
M
ERGENC
Y
S T O P
Dimensions:
inches
(mm)
Summary of Contents for wpc 2000
Page 91: ...1128500 WPC 2000 User Manual 2 64 Installation ...
Page 191: ...1128500 WPC 2000 User Manual 5 22 Troubleshooting ...
Page 209: ...1128500 WPC 2000 User Manual A 18 Extracts from OSHA and ANSI ...
Page 225: ...1128500 WPC 2000 User Manual G 6 Glossary ...
Page 231: ......
Page 232: ......
Page 233: ......
Page 234: ......
Page 235: ......
Page 236: ......
Page 237: ......
Page 238: ......
Page 239: ......
Page 240: ......
Page 241: ......
Page 242: ......
Page 243: ......
Page 244: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......