Shadow VI User Manual
1107200
Installation and Checkout
Chapter 2
page 17
Installation Procedure
DANGER
!
FAILURE TO PERFORM SAFETY SYSTEM TESTS
•
Perform the final checkout sequence below when you have completed installation of your
light curtain, before operating the equipment it is connected to.
•
Operate your machinery only after your safety system meets all the requirements of the
checkout sequence.
•
Perform the final checkout sequence whenever repair, maintenance or modification is
performed on your light curtain or the machinery it is connected to.
•
Perform the “daily test” safety system checkout sequence on page 93 (in French, en
Français, page 114) every day before operating any machinery connected to Shadow safety
light curtains.
Failure to comply with these instructions will result in death or serious injury.
WARNING
!
ELECTRIC SHOCK HAZARD
•
Turn off and disconnect power from the Shadow safety light curtain and from the machinery
it is connected to before making any wiring connections. This includes disconnecting power
to the machine control and motor.
•
Remove all fuses and “tag out” per OSHA 1910.147 Control of Hazardous Energy
(Lockout/Tagout).
•
Ensure that installation is performed by qualified personnel.
Failure to comply with these instructions could result in death or serious injury.
The installation procedure is divided into these steps:
• Calculating the safety distance
• Designing and mounting brackets
• Loosely mounting Shadow VI heads
•
Mounting the control
• Wiring the transmitter and receiver to the control
•
Connecting AC wiring to the control
• Connecting stop circuits to the control
• Making settings inside the control
• Aligning and tightening down Shadow VI components
•
Diagnostic steps to perform
before
Shadow operation
• Final checkout sequence
It is a good idea to read over the complete installation procedure before starting. This will
guide you about the materials and techniques required for making and positioning mounting
brackets and aligning Shadow VI heads.
Summary of Contents for Shadow VI
Page 142: ...1107200 Shadow VI User Manual page 130 Appendix C Installation of Shadow VI WPC Control Board ...
Page 144: ...1107200 Shadow VI User Manual page 132 Appendix D Replacement Parts ...
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......