10.5
Examine the supply unit for fuel leakage
Periodicity
Description
Unscheduled
Duration for performing Preliminary requirements
0.0 man-hours
Duration for performing the Procedure
1.0 man-hours
Duration for performing the Requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
CAUTION
Injury Hazard: Always put on gloves and safety goggles when you do work on hot or
pressurized components. When you open the screw plugs, fuel can come out as a spray
and cause injury.
PRELIMINARY OPERATIONS
•
None
X52
AA00-0000-00AAA-311B-A
Operation Manual
Examine the supply unit for fuel leakage
Winterthur Gas & Diesel Ltd.
- 376 -