![WinGD X82-B Maintenance Manual Download Page 462](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581462.webp)
8.7.2
Piston - prepare before removal
Periodicity
Description
Working hours
36 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Support equipment
Description
Part No.
CSN
QTY
Lifting tool
94209
1
Distance holder
94230
2
Piston suspension device
94341
1
Plate
94341A
2
Supplies
Description
QTY
Oil
A/R
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
WARNING
Injury Hazard: Before you operate the turning gear, make sure that no personnel are near
the flywheel, or inside the engine.
PRELIMINARY OPERATIONS
•
The cylinder cover must be removed, refer to section
•
The engine temperature must be cool.
X82-B
AA00-3403-00AAA-523A-A
Maintenance Manual
Piston - prepare before removal
Winterthur Gas & Diesel Ltd.
- 462 -
Issue 001 2020-10
Summary of Contents for X82-B
Page 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Page 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Page 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Page 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Page 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Page 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Page 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Page 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Page 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...