![WinGD X72-B Operation Manual Download Page 58](http://html1.mh-extra.com/html/wingd/x72-b/x72-b_operation-manual_986578058.webp)
2.7
Access to engine spaces
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
WARNING
Injury Hazard: Be careful of the slippery and sharp edges inside the engine spaces.
PRELIMINARY OPERATIONS
•
The engine must be stopped and prepared for maintenance, refer to section
the engine after stop - general
X72-B
AA00-0000-00AAA-012E-A
Operation Manual
Access to engine spaces
Winterthur Gas & Diesel Ltd.
- 58 -
Issue 003 2021-12