8.11
Change-over the diesel fuel automatically
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
WinGD recommends to always do this automatic change-over procedure when possible.
There is no load limit of the engine to do an automatic fuel change-over.
X72-B
AA00-0000-00AAA-131E-A
Operation Manual
Change-over the diesel fuel automatically
Winterthur Gas & Diesel Ltd.
- 336 -
Issue 003 2021-12