5. If applicable, install the insulation and the cover plate.
6. Adjust the cleats. Refer to section
on page 14.
6.2.6
Replace the handle bearing
Procedure
1. Secure the door in the open position.
2. If the door has insulation, remove the
cover plate and the insulation.
3. Remove these parts:
a) Pillar bolt (A)
b) Socket bolt (B)
c) Handle (C)
4. Remove the internal mechanism.
5. Replace the bearing bush (A) and the
seal (B).
6. Install the internal mechanism.
7. Install these parts:
a) Handle (C)
b) Socket bolt (B)
c) Pillar bolt (A)
8. If applicable, install the insulation and
the cover plate.
9. Close the door.
B
C
A
B
A
B
C
A
Maintenance
16
19 - 001 - 29.05.2020