33
Final Start-up
Once the system has been adequately charged, the electrical has been double
checked, and the ductwork has been connected, power on the unit.
•
Once the impeller is running, check the ducts and ductwork connections for any
air leaks.
•
Balance Air Distribution.
•
Confirm condenser airflow is unrestricted.
•
Check for excessive noise or vibration.
COMPLETE YOUR START-UP CHECKLIST
FOUND ON THE NEXT PAGE