![WINAM PLAY 200202 Installation Manual Download Page 1](http://html1.mh-extra.com/html/winam/play-200202/play-200202_installation-manual_984469001.webp)
SINGLE MAST NET CLIMBER
MODEL NO.
GS-W1002-1
1
INSTALLATION MANUAL
Safety Checklist after first assembly
●
Test intervals of Safety: 6 months
●
Test Component and contents:
1. Removing the reticulated system:
- Check of removing condition each rope
- Screwing the turn buckle and conversion the turnbuckle
in anchors plate(see for this workstep turnbuckle assembly)
2. Abrasion condition of rope:
- Checking of all rope surface
- Strengthned of rope: Coating on the surface
3. Attachment condition of the anchors plate and turnbuckle
4. Screwing condition of all bolt
5. Galvanizing condition of the steel component:
- Protection of steel component from corrosion.
●
Measure
In case of the appearance the defect detail is
repaired usually within 3 days after checking.
By Lappset Group Oy
200202/ 220202
Tel) (028) 22 494 333
E-mail) [email protected]
WINAM GROUP
Web site) www.playground.com.vn
Room 101, 226/4A Le Trong Tan, Tay Thanh
ward, Tan Phu district, Ho Chi Minh city, Viet Nam
BY WINAM GROUP
WINAM GROUP
WINAM GROUP., LTD
Room 101, 226/4a Le Trong Tan, Tay Thanh
ward,
Tan Phu district, Ho Chi Minh city, Viet
N
am
Tel)
(028) 22 494 333
E-mail)
Web site) www.
playground.com.vn