Table of Contents
INTRODUCTION . . . . . . . . . . . . . . . . . . 2-3
INITIAL INSPECTION . . . . . . . . . . . . . . . 2-3
PREPARATION FOR USE . . . . . . . . . . . . . 2-4
Power Requirements . . . . . . . . . . . . . . . . 2-4
Line Voltage Selection . . . . . . . . . . . . . . . 2-4
Power Connection . . . . . . . . . . . . . . . . . . 2-4
Standby Operation . . . . . . . . . . . . . . . . . 2-5
Warmup Time . . . . . . . . . . . . . . . . . . . . 2-6
Operating Environment . . . . . . . . . . . . . . 2-6
GPIB SETUP AND INTERCONNECTION . . . . . 2-7
Interface Connector . . . . . . . . . . . . . . . . . 2-7
Cable Length Restrictions . . . . . . . . . . . . . 2-7
GPIB Interconnection . . . . . . . . . . . . . . . 2-7
Setting the GPIB Address . . . . . . . . . . . . . 2-7
Selecting the Line Terminator . . . . . . . . . . . 2-9
Selecting the Interface Language . . . . . . . . . 2-9
RACK MOUNTING KIT INSTALLATION . . . . . 2-10
PREPARATION FOR STORAGE/SHIPMENT . . . 2-13
Chapter 2
Installation
Summary of Contents for 680 B Series
Page 5: ......
Page 11: ...Figure 1 1 Series 680XXB Synthesized CW Generator...