Installation and operating instructions • Wilo-DrainLift BOX • Ed.06/2022-10
47
7.5
Test run
Before the lifting unit starts in automatic mode, conduct a test run. A test run checks the
proper functioning of the unit.
✓
Lifting unit installed.
✓
Floor drain or cover plug are removed.
1.
Activate the lifting unit: Insert plug into socket.
⇒
Wilo-DrainLift Box... E/BOX... D
: Lifting unit is in automatic mode.
⇒
Wilo-DrainLift BOX... DS
: Check operating mode of the switchgear. The switchgear
must operate in automatic mode.
2.
Open the shut-off valve on the inlet and discharge sides.
⇒
Collection reservoir is filled slowly.
3.
Lifting unit is switched on and off using the level control.
⇒
To conduct a test run, complete two entire pumping procedures.
⇒
When pumping out, the pump must not start slurping operation.
Wilo-DrainLift Box... E/BOX... D
: If slurping operation lasts longer than 1 s, readjust
the length of the float switch cable.
Wilo-DrainLift BOX... DS
: If slurping operation lasts longer than 1 s, adjust the
switchgear’s follow-up time.
4.
Close the gate valve in the inlet.
⇒
The lifting unit must be activated because there is no more fluid flowing in. If the
lifting unit switches on again, the non-return valve is leaky. Contact customer ser-
vice!
5.
Open the gate valve in the inlet again.
▶
Lifting unit operates in automatic mode.
Following a successful test run, the floor drain or the cover plug must be put back on!
7.6
Follow-up time
The follow-up time is pre-set at the factory to 3 seconds. The follow-up time can be ad-
justed as required:
•
Increasing the usable volume per pumping process.
•
Extensive suction of settling sediments on base of tank through integrated depth suc-
tion.
•
Slurping operation for avoiding pressure surges.
To set the follow-up time, read the installation and operating instructions for the
switchgear!
CAUTION! Pay attention to the operating mode if the follow-up time is changed. The
operating mode indicates the activation period and the downtime!
8
Operation
The lifting unit operates in automatic mode by default and is switched on and off using the
integrated level control device.
✓
Commissioning was carried out.
✓
Test run has been completed successfully.
✓
The operation and functioning of the lifting unit are known.
1.
Activate the lifting unit: Insert plug into socket.
2.
“DS” version: Select automatic mode on the switchgear.
▶
The lifting unit operates in automatic mode and is controlled depending on level.
9
Shut-down/dismantling
9.1
Personnel qualifications
•
Operation/control: Operating personnel, instructed in the functioning of the complete
system
•
Electrical work: qualified electrician
Person with appropriate technical training, knowledge and experience who can identify
and prevent electrical hazards.
•
Installation/dismantling work: trained specialist in plant technology for sanitary facilities
Fixation and buoyancy safeguards, connection of plastic pipes
Summary of Contents for DrainLift BOX
Page 2: ...DrainLift BOX https qr wilo com 742...
Page 3: ...3 Chinese 4 English 26...
Page 5: ...zh CHS Wilo DrainLift BOX Ed 06 2022 10 5 1 1 1 1 2 WILO SE 2022 1 3 Wilo 1 4 Wilo 2 2 1...
Page 6: ...zh CHS 6 Wilo DrainLift BOX Ed 06 2022 10 1 2 2...
Page 8: ...zh CHS 8 Wilo DrainLift BOX Ed 06 2022 10 2 7 2 8 2 9 3 3 1 DIN EN 12050 EN 12050 2...
Page 51: ......