
6.
Wieland Electric | BA000341 | 02.2007
Electrical Installation
| 6
The electrical connection on the energy bus flat cable is carried out by screwing in the pen-
etrating screws.
It is recommended to use a cordless driver with adjustable torque.
CAUTION
The following notices must be observed when handling penetrating screws:
• All penetrating screws must be screwed in to the stop.
• Use a pneumatic or electrical screwdriver.
• Use Phillips no.1 screwdriver blades with a shaft length of at least 45 mm.
• Maximum torque 1 Nm.
• Screwed in penetrating screws must not be unscrewed again. When removing a podis
field distributor from the flat cable, use the podis sealing sleeve (Z1.005.6553.1) to seal
the contact positions.
• Only original screws from Wieland Electric may be used.
• Operation with torn off screws is not allowed.
• Cable ties must not be removed, and the cover of the penetrating screws (connecting
plate) must be inserted after complete installation.
Summary of Contents for podis?MOT FA C 1I3O
Page 2: ......
Page 26: ...Wieland Electric BA000341 02 2007 podis MOT FA C 2I1O 1I3O Device Description 3...
Page 32: ...Wieland Electric BA000341 02 2007 podis MOT FA I C 1I4O Device Description 4...
Page 34: ...Wieland Electric BA000341 02 2007 Mechanical Installation Assembly 5...
Page 42: ...Wieland Electric BA000341 02 2007 Commissioning 7...
Page 46: ...Wieland Electric BA000341 02 2007 Operation 8...
Page 57: ...10 Wieland Electric BA000341 02 2007...
Page 58: ......
Page 59: ......
Page 60: ......