Wicksteed Leisure Ltd, Digby Street, Kettering, Northants NN16 8YJ    Tel: 01536 517028   Fax: 01536 410633

www.wicksteed.co.uk   E:[email protected]

No part of this document may be copied or used without the express written permission of WICKSTEED LEISURE LTD (c) 2013

FFH

SIZE

AGE RANGE

PROD. CODE

TECHNICAL DATA

MINIMUM SPACE REQUIRED

SUPERVISED PLAY

EQUIPMENT TYPE

LARGEST PART

RECOMMENDED

HEAVIEST PART

INSTALLATION DETAILS

1. READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT
 
2. EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT
 
3. ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY
 
4. BACKFILL FOUNDATIONS WITH              CUBIC M CONCRETE ALLOWING TO SET FOR 48 HOURS
 
5. REMOVE ALL ASSEMBLY AIDS BEFORE THE EQUIPMENT IS USED

THIS PRODUCT CONFORMS WITH BS EN1176-    :2008

Version:
Date:

YOUNG EXPLORER

HILLARY

HILLA

L:11.25 W:4.55  H:2.8

2.2M

6-11 YEARS OLD

14.25M X 8.15M

HIGH LEVEL

2.3M X 2.4M X 0.55M

SLIDE APPROX 39KG

0.08

1

D
13/09/13

& BSEN1176-3:2008

Summary of Contents for YOUNG EXPLORER HILLARY

Page 1: ...NSTALLATION DETAILS 1 READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT 2 EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT 3 ENSURE TO CHECK AND...

Page 2: ...NS 400MM X 400MM X 600MM DEEP UNLESS OTHERWISE SPECIFIED FOUNDATION 550 X 550 X 600 DEEP 2275 0 2199 0 506 0 1876 0 SLIDE FIREMANS POLE SCRAMBLE NET NET CLIMBER CLIMBING TRAVERSE WALL PULL UP ROPE CLI...

Page 3: ...PAGE OF 3 3 13195 0 616 0 2528 0 3984 0 4134 0 3998 0 90 8 SQ METRES WETPOUR SURFACING 38 0 LINEAR METRES WETPOUR EDGING 71 GRASS SAVER TILES 1 5M X 1 0M 13500 0 8500 0 4000 0...

Page 4: ...01363 GROUND ANCHOR YOUNG EXPLORER 16 1 FRMT01393 HILLARY GUARD RAILING 17 1 FRMT01419 ANGLED SLIDE LEG FIXING 18 1 FRMT01420 SLIDE LEG FIXING 19 11 SSB505090 50 X 50 X 90 DEG ANGLE BRACKET 20 10 SSB5...

Page 5: ...t height With the deck in place over the upright posts secure using the supplied M12 X 200 Coach Bolt Washer Nyloc Use sheet labelled HILLA SPEC to create the foundation holes DETAIL VIEW 1 ATTACH SLI...

Page 6: ...oosely attach the rope to post item T and to the third plank from the bottom on the climber Secure the climber to the deck using the supplied brackets with fixings Then re connect the top two planks 3...

Page 7: ...40 41 35 39 40 41 SURFACE LEVEL 900 0 1680 0 ATTACH SCRAMBLE NET Secure the horizontal post from the Hillary Timber Set labelled U to the two upright posts using the supplied Coach bolt The vertical p...

Page 8: ...rackets are secured to the bridge using the supplied Coach Bolts and to the deck using the supplied Coach Screws DETAIL VIEW 3 31 40 41 900 0 900 0 600 0 900 0 1800 0 1550 0 Finally attach the bridge...

Page 9: ...oach Screw with Washer With the posts in place secure the Trapeze Ropes to the top beam using a Nyloc and Washer 39 40 CREATE THE DECK CLIMBING WALL With post labelled R in the foundation hole secure...

Page 10: ...rew with Washer Secure the Net Climber to the deck upright post and to the post labelled H making use of the pre drilled counterbore holes POST I POST H 2775 0 1740 0 600 0 The timber climbing wall is...

Page 11: ...planks and side fascia NOTE Before concreting the upright posts into position ensure counterbore holes for Parallel Rope are aimed in the correct direction 900 0 1200 0 POST S 600 0 1100 0 ATTACH PAR...

Page 12: ...riately tensioned The top of the concrete should be 100mm below the finished surface level 2 Leave the concrete to set for 48 hours 3 Sand and rough edges or surfaces and treat with preservative if ne...

Reviews: