background image

PAGE     OF  

1

4

Wicksteed Leisure Ltd, Digby Street, Kettering, Northants NN16 8YJ    Tel: 01536 517028   Fax: 01536 410633

www.wicksteed.co.uk   E:[email protected]

No part of this document may be copied or used without the express written permission of WICKSTEED LEISURE LTD (c) 2013

FFH

SIZE

AGE RANGE

PROD. CODE

TECHNICAL DATA

MINIMUM SPACE REQUIRED

SUPERVISED PLAY

EQUIPMENT TYPE

LARGEST PART

RECOMMENDED

HEAVIEST PART

INSTALLATION DETAILS

1. READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT
 
2. EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT
 
3. ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY
 
4. BACKFILL FOUNDATIONS WITH              CUBIC M CONCRETE ALLOWING TO SET FOR 48 HOURS
 
5. REMOVE ALL ASSEMBLY AIDS BEFORE THE EQUIPMENT IS USED

THIS PRODUCT CONFORMS WITH BS EN1176-    :2008

Version:
Date:

ACTION AND ADVENTURE

PICK UP STICKS 'SEVEN'

PICUS7

L: 6.84M W: 7.82M H: 2.4M

1.8M

7+ YEARS OLD

9.75M X 10.94M

HIGH LEVEL

4.6M X 0.125

34KG (POST 012)

0.096

1

A
09/08/13

Summary of Contents for Pick-up sticks Sevin

Page 1: ...T INSTALLATION DETAILS 1 READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT 2 EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT 3 ENSURE TO CHECK A...

Page 2: ...OF 2 4 ALL FOUNDATIONS ARE 400 X 400 X 700 DEEP FOUNDATION PLAN 1 50 A4 2150 0 2850 0 2429 9 1600 0 2150 0 2104 0 1894 0 1767 0 1075 0 1075 0 2505 0 2766 0 2857 0 275 0 275 0 3129 0 3092 0 2825 0 266...

Page 3: ...PAGE OF 3 4 SCALE 1 60 A4 9567 7 10941 1 1587 2 1602 8 1120 3 1500 2 1500 2 1705 4 1547 2 1550 0 72 6 SQ METRES WETPOUR SURFACING 34 5 LINEAR METRES WETPOUR EDGING MINIMUM SPACE...

Page 4: ...PAGE OF 4 4 10000 0 11500 0 1749 8 2025 0 1711 1 2320 4 2487 9 62 GRASS SAVER TILES 1 5M X 1 0M MINIMUM SPACE...

Page 5: ...7 IN AY AK OF 1 10 12 08 13 Parts List ITEM QTY PART NUMBER DESCRIPTION 1 1 FRTB00803 PICUS7 TIMBER SET 2 1 FRMS00804 PICUS7 ROPE SET 3 1 FRMT00801 PICUS8 12 GROUND ANCHOR 4 16 M12X180CHS M12 x 180 CH...

Page 6: ...g foundation holes ensuring the posts are rotated correctly to aid with later stages of this installation Prop posts 003 006 into the foundation holes As illustrated below add the horizontal post 012...

Page 7: ...oned in the correct places Use the below diagram to position post 014 into the correct pre drilled hole SURFACE LEVEL With post 014 positioned in place start to position and secure 6 x post 021 into p...

Page 8: ...PAGE OF 4 10 006 005 014 013 012 011 NOTE Use dimensions to measure parallel to posts 011 012 950 0 400 0 700 0 800 0 750 0 460 0 650 0 700 0 400 0 1100 0 450 0 820 0...

Page 9: ...resting on angled timber 012 Secure to post 004 using the supplied Coach Bolt As illustrated with the other end approx 1465mm from the end of post 012 mark and drill a n8mm pilot hole Re position pos...

Page 10: ...003 and remove post 017 Drill a n13 hole through post 003 re position post 017 and secure with the supplied Coach Bolt The point at which post 016 rests on post 017 use the pre driled counterbore hol...

Page 11: ...side resting on post 012 Using the pre drilled hole on post 017 secure post 019 to post 017 using the supplied Coach Screw 019 017 008 012 006 1695 0 1060 0 019 NOTE Use dimensions to measure paralle...

Page 12: ...to the upright posts using the supplied Coach Bolts Next position post labelled 022 to post 007 and on top of horizontal post 011 Secure to post 007 using the supplied Coach Bolt and on top of post la...

Page 13: ...pplied Coach Bolts Next position post labelled 021 on top of the above installed horizontal post 020 and to the inside of post 007 Secure to post 007 using the supplied Coach Bolt and on top of post l...

Page 14: ...the ropes can be added to the unit Below is a description of the ropes and which posts they are attached to With the ropes loosely attached the posts can be adjusted to ensure that the ropes are full...

Reviews: