
33
10.8.2
Fit one end of a delivery hose to the hose tail inlet on the blade with a hose clip and after
routing and filling the delivery hose, connect to the hose tails on the outside of the
cabinet.
10.8.3
Repeat the procedure for the other hose.
10.9
Fill the Hoses and Blade’s
On relatively short hose runs the main lubricator pump can be used to pump grease from the reservoir
to the Blades.
On the Control Panel periodically press the Pump Run button.
Continue cycle until grease is evident at all Blade ports.
Do not run for more than 10 seconds with a 30 second interval between operations.
Note:
On multiple (greater than two) blade systems it can be useful to close the restrictor valve
at all but one of the blade sets to aid the process and then alternate the open blade until
all grease paths are primed.
On longer hose runs it can be more efficient to connect the motor directly to the battery and leave it
running for 60 seconds and then allow a 2 minute break before continuing the cycle.