4-Drawer Garment Rack
Assembly
Time:
Less than
45 minutes.
This product's
intended use is for
garment storage.
Tools Needed:
No extra tools required.
Page 1
A
2 ea
Base
B
2 ea
Bottom vertical tube
C
2 ea
Upper vertical tube
E
2 ea
Horizontal base tube
F
2 ea
Horizontal middle tube
D
1 ea
Top hanging tube
G
2 ea
Side frame bracket
H
2 ea
Base hex screw
I
4 ea
Long hex screw
K
4 ea
Short hex screw
L
2 ea
Hex screw
M
4 ea
Drawer
O
1 ea
Drawer frame
N
4 ea
Drawer bottom
P
2 ea
Wheel
Q
2 ea
Wheel with lock
R
1 ea
Hex wrench
STEP 1.
Attach a bottom vertical tube (B) to a base (A)
using a base hex screw (H). Tighten with hex wrench
(R). Repeat for the other side.
STEP 2.
Attach a side frame bracket (G) to the bottom
vertical tube (B) using a medium hex screw (J). Tighten
with hex wrench (R). Repeat for the other side.
STEP 3.
Insert two horizontal base tubes (E) and two
horizontal middle tubes (F) into the drawer frame (O)
sleeves at the top and bottom corners. Attach each end
of the horizontal middle tubes (F) to the side frame
brackets (G) using four short hex screws (K). Tighten
with hex wrench (R). Attach each end of the horizontal
base tubes (E) to the bases (A) using four long hex
screws (I). Tighten with hex wrench (R).
STEP 4.
Insert an upper vertical tube (C) into a
bottom vertical tube (B). Attach with a hex screw (L).
Tighten with hex wrench (R). See note. Repeat for
the other side.
STEP 5.
Install the top hanging tube (D) by sliding
over the top vertical tubes (C) until the locking tabs
lock into place.
STEP 5.
Install the wheels (P) and wheels with locks
(Q) to the bases (A).
J
2 ea
Medium hex
screw
A
E
H
E
F
G
G
O
F
A
B
C
D
B
C
I
J
K
L
J
I
K
L
I
K
H
P
K
P
Q
Q
I
NOTE:
The
locking tab should
be at the top of
the upper vertical
tube (C).