16
OPERATION
Preliminary Check
a) Is machine levelled?
b) Are voltage and frequency of main supply the same as indicated on rating plate?
c) Is drainage system functioning?
d) Is air circulation and room temperature adequate? (Air-cooled models)
ROOM TEMPERATURE
WATER TEMPERATURE
MAXIMUM
43° C
35° C
MINIMUM
5° C
5° C
e) Is water pressure adequate?
MAXIMUM
0.7 Kg/cm2
MINIMUM
6 Kg/cm2
ATTENTION:
Check that voltage and mains frequency are the same as in the rating plate.
Starting up
Once preliminary check has been completed (ventilation, connections, temperature, etc.), proceed as follows:
1) Open water faucet. Check for leaks.
2) Plug machine into electricity mains supply.
3) Ensure that there are no strange vibrations or scraping sounds
4) Check that the water curtain moves freely
6) After 10 minutes, check that the water bin has no leaks on the maximum level overflow.
7) At the cycle’s end, there should be frost formed on the compressor inlet tube except for the last 50
mm.
IMPORTANT!
Be sure voltage and frequency of main supply correspond to indicated levels on rating plate.
ADVISE THE FINAL USER ON MAINTENANCE PROCEDURES WHICH ARE NOT INCLUDED IN WARRANTY
, AS
WELL AS THOSE BREAKDOWNS CAUSED BY NEGLECT OF PROPER MAINTENANCE PROCEDURES.