![Wexiodisk WD-100GR Installation And User Manual Download Page 22](http://html.mh-extra.com/html/wexiodisk/wd-100gr/wd-100gr_installation-and-user-manual_966960022.webp)
WD-100GR
Rev. 5.0 (202207)
Installation instructions
18
Electrical connection of the equipment
•
Remove the cover plate beneath the electrical cabinet. The panel is fixed
with screws on the bottom edge under the stand.
•
The terminal block for connecting the dosing equipment is in the junction
box (C) inside the cover plate. The FU/DM circuit breaker for the equipment
is in the electrical cabinet. (For connection information, see the wiring dia-
gram).
•
A hole for fitting a measurement cell can be found in the tank. Remove the
sealing plug and insert the measurement cell into the existing hole.
Dosage
•
The water outlet (A) for the detergent dosage is placed on the incoming hot
water pipe.
•
The hose on the back of the machine is connected to a detergent container.
The hose supplied with the machine is connected to the wash tank.
•
The connection for drying agent (B) is located next to the booster heaters.
3.5.8
Bleeding the booster pump
Bleeding of the booster pump must be performed when the dishwasher is started
up.
This is what you should do:
1.
Open the water connection to the dishwasher and wait until the dishwash-
er’s break tank has filled with water.
2.
Loosen the screw in the ventilation hole on the booster pump and release
any air. When water starts to run out of the ventilation hole, the screw is
tightened.
Summary of Contents for WD-100GR
Page 2: ......