![Westell VirtualEdge VELGX-30 Manual Download Page 3](http://html1.mh-extra.com/html/westell/virtualedge-velgx-30/virtualedge-velgx-30_manual_959958003.webp)
Section VEL‐GX3‐20A
030‐101804 Rev. B
R
3
1310IARB
Figure 3. Mounting Views
19” Rack Mounting
23” Flush Rack Mounting
Wall Mounting
Attach long flange of ear to VELGX‐30 panel
Attach panel to rack
D
D
Attach short flange of ear to VELGX‐30 panel
D
Attach panel to rack
D
Attach ears to panel, as shown
D
Mark and pre‐drill mounting holes in wall*
D
(brackets reversed/flipped)
Attach panel to wall
D
(Use keyhole‐shaped holes)
Panel is flush against front face of channel**
Long flange
of ear attaches
to rack channel
Short flange
of ear attaches
to rack channel
* Can be mounted vertically, if desired.
** For a “projected” appearance, bring or mount the panel further forward on the ears.
D‐rings are optional
D‐rings are optional
(ships with towel bar attached)
1.
Determine vertical position in rack.
Determine and select
the vertical mounting location in the rack. This panel re
quires one
vertical
Rack Unit (RU) in a standard Telco
relay rack.
2.
Remove ears from bag.
Locate the bag of parts shipped
with the panel and remove the two L‐shaped mounting
ears and the rack mounting hardware. Each ear flange has
several sets of mounting holes in it.
3.
Determine horizontal position (shelf projection).
The
mounting ears and the panel's side flanges have several
mounting holes from which to choose, for the desired
amount of projection in the rack. If a
projected look
or ori
entation in the rack is desired, the ears should be attached
in the last, rear‐most, ear hole position on the panel's side
flanges, so that the panel will be projected further forward
from the mounting ears. If a
flush look
in the rack is de
sired, the mounting ears should be attached in the first or
forward‐most ear hole position on the panel's side flanges.
4.
Attach short flange of ear to panel.
Attach both ears to the
panel in the desired projection position as determined in
the step above, using the hardware provided. The ear's
short flange abuts the panel.
5.
Attach panel to rack.
Lift the panel and attach it to the rack
channels in the correct vertical rack position. Align the
holes in the ear's long flange with the proper holes in the
rack channels. Insert the provided screws into the aligned
set of holes, then tighten the screws. Repeat for both ears.
2.3
Mounting on a Wall
The mounting ears can be attached for wall mounting. Follow
local codes and company practices for the proper wall type.
1.
Determine position on wall.
Select the mounting location
on the approved wall. This panel requires one
vertical
Rack Unit (RU) in a standard Telco relay rack.
Note that the
panel can be mounted in a vertical position, if desired.
2.
Remove ears from bag.
Locate the bag of parts shipped
with the panel and remove the two L‐shaped mounting
ears and the rack mounting hardware. Each ear flange has
several sets of mounting holes in it.
3.
Determine horizontal position (wall projection).
The
mounting ears and the panel's side flanges have several
mounting holes from which to choose, for the desired
amount of projection from the wall. If a
more projected
position
on the wall is desired (allows greater rear access),
the ears should be attached in the last, rear‐most, ear hole
position on the panel's side flanges. If a
less projected posi
tion
on the wall is desired (allows more front access), the
mounting ears should be attached in the first or forward‐
most ear hole position on the panel's side flanges.
4.
Attach ears to panel.
Attach both ears to the panel in the
desired projection position as determined in the step
above, using the hardware provided.
5.
Mark mounting hole locations.
Lift and place the panel on
the wall in the desired final position and mark the mount
ing holes to be drilled in the wall with a marking utensil.