Service Manual
Disassembly and reassembly
43
7.
Note how the two pump wires are connected to the pump.
8.
Desolder the two pump wires connected to the pump.
9.
Clip the pump cable ties.
REASSEMBLY:
Secure the pump wires INSIDE the cable ties. Position the pump and replacement cable
ties in the locations noted in
. The back of the pump should align with
the back of the pump bracket. Note that the pump wires go inside the cable ties as
shown:
NIBP disassembly, part 3: Removing the valve assembly
10. Note the routing of the cable pack through the notch in the bottom of the valve
assembly.
Cable ties
Pump wires
Red wire to the
+ terminal
Red
Black
Black wire to the
unmarked terminal
Cable ties
Pump wires
Summary of Contents for Propaq LT 802LT0N
Page 1: ...Propaq LT Vital Signs Monitor Service Manual Software version 1 5X or later ...
Page 4: ...iv Contents Welch Allyn Propaq LT Vital Signs Monitor ...
Page 8: ...4 Safety summary Welch Allyn Propaq LT Vital Signs Monitor ...
Page 28: ...24 Troubleshooting and repair Welch Allyn Propaq LT Vital Signs Monitor ...
Page 74: ...70 Functional verification Welch Allyn Propaq LT Vital Signs Monitor ...
Page 78: ...74 35 ml test volume Welch Allyn Propaq LT Vital Signs Monitor ...