70
Repair Procedures
Welch Allyn Propaq Encore Vital Signs Monitor
Replacing PROMs
Read
The PROMs require a special removal tool to replace them. (
page 48.) To prevent damage to the PROM sockets, do not use any other tools.
Do not remove the PROMs from the Analog and Digital board. The following instructions
describe how to replace all other PROMs:
•
To remove the PROMs, insert the fingers of the PROM removal tool into the slots
at two corners of the PROM and pull out the PROM, while squeezing the legs
against the PROM.
•
To load the new PROM, align the beveled corner of the PROM with beveled
OUTSIDE corner of the socket. Carefully press the new PROM into place.
Caution
The PROMs can be damaged by static discharge. Work only at a static-
protected work station.
1097-02
Beveled
Corner
PROM
Slot
Beveled
Outside
Corner
Slot
Fingers
Summary of Contents for Propaq Encore
Page 1: ...Propaq Encore Vital Signs Monitor Service Manual...
Page 14: ...10 Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Page 50: ...46 Troubleshooting Welch Allyn Propaq Encore Vital Signs Monitor...
Page 96: ...92 Repair Procedures Welch Allyn Propaq Encore Vital Signs Monitor...
Page 111: ...Service Manual Technical Overview 107 Cabling Diagrams cabling diag...
Page 120: ...116 Technical Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Page 126: ...122 Field Replaceable Units FRUs Welch Allyn Propaq Encore Vital Signs Monitor...
Page 128: ...124 Manufacturable Test Equipment Welch Allyn Propaq Encore Vital Signs Monitor...