7.2 Steps for commissioning
1. Rinsing the sludge separator
▶
Close flow and return shut off devices of heating circuit.
▶
Close flow and return shut off devices of hot water circuit.
▶
Provide collecting container.
▶
Remove cladding
3
.
▶
Remove hose
4
from cladding and connect to rinsing device
1
.
▶
Open rinsing device
1
and rinse sludge collector
5
.
▶
Refill water quantity via rinsing device
2
:
system pressure = inlet pr 0.5 bar.
Installation and operating instruction
Hydraulic unit WWP L 7 ... L 15
7 Commissioning
83279602 • 1/2014-05 • La
34-59