4 Installation
Only valid in Switzerland
When installing and operating in Switzerland the regulations of SVGW, VKF, and
local and Cantonal regulations, as well as the EKAS guideline (Liquid Petroleum Gas
Guideline, Part 2) must be observed.
Remove front panel
▶
Open flap
1
on boiler control panel.
▶
Undo screw
2
and remove front panel.
Transport
For transportation, ¾" pipes can be screwed in at 4 points.
▶
Screw ¾" pipes to the transport points
1
.