Installation and operating instruction
Dual fuel burner WGL30/1-C ZM
4 Installation
83260202 1/2019-02 La
29-144
4.3.1 Rotate burner by 180° (optional)
The following are required for the conversion:
Wedge profile flange gasket
Brackets for two air pressure switches
Bracket (short) for oil pump servicing
Oil line 8 x 1.0
Screwed union EVW 08-PL
Screwed union EVT 08-PL
Rotate burner flange
1
by 180° and mount with flange gasket
2
.
The aperture between combustion head and refractory should be filled with
flame-proof, resilient insulating material (do not make solid).
18
0°
1
1
Remove operating panel
1
.
Remove cover
3
and unplug plug
2
.
Remove support
7
for oil hoses and bracket
8
.
Unplug plugs
6
and
0
.
Undo screws
4
and remove the complete oil pump
9
.
Remove fastening angle
5
.
Rotate burner
q
by 180° and mount to burner flange
w
securing with screws
e
.
180°
6
7
8
9
0
q
w
e
3
4
1
5
2