Operation and Maintenance Manual and User Service Guide for Industrial Power WP10 Series Diesel Engine
3
Notice
1
.
Before delivery, this series of diesel engines have already been tested,
strictly following the test codes. Therefore, never dismantle the lead
sealing on the throttle to raise its openness; never dismantle or impact
the rotor of turbocharger which belongs to the sophisticated parts;
never loosen or remove the main bearings of diesel engine and bolts
attached to the connecting rod which have strict requirements for
torque and turning angles. Otherwise, our factory will not perform the
“Three
-
guarantee”. Hope t
he user pay attention to it.
2
.
As the bolts for connecting rod are disposable, never reuse them.
3
.
The operator should carefully read this Operation and Maintenance
Manual, be familiar with the structure of the diesel engine and closely
abide by the technical operation and maintenance procedures specified
in this manual.
4
.
At any time of starting the diesel engine, please check whether the
coolant and oil is filled up.
5
.
For the new diesel engine, 50h running-in is needed, with maximum
load not more than 80% of the rated load and average load not more
than 60%.
6
.
The starting time of the engine should not last for more than 30s. If the
engine can
’
t be started within 30s, wait for 1-2min for startup again.
7
.
After the diesel engine is cold started, please slowly increase the
rotating speed and never idle running for long time. After engine
running with heavy load, do not immediately stop it. It is necessary to
idle running for 5-10 min at low speed.
8
.
After engine is stopped, if the ambient temperature is less than 0
℃
,
moreover the antifreeze additive is not applied, please completely
drain the water in radiator and diesel engine.
9
.
The diesel engine is prohibited to work without air cleaner which could
prevent the air not to be filtrated from entering the cylinder.