![weha Hippo Bundle Rack Set Operation And Service Instructions Manual Download Page 5](http://html1.mh-extra.com/html/weha/hippo-bundle-rack-set/hippo-bundle-rack-set_operation-and-service-instructions-manual_950955005.webp)
Operation and Service Instructions
5
Version: 10.02.2020
5 Maintenance and inspection
The slab stand requires regular maintenance.
According to ZH 1/428, this is a storage device that must be checked by an expert regularly.
The following inspection must be carried out at least once a year:
•
Check the slab stand for rust. Pay special attention to the welding seams.
•
Remove possible rust and protect the relevant areas by applying a suitable rust protection agent, e.g. zinc spray.
6 List of spare parts
Quantity
Designation
Article number
2
Perforated rail galvanized
104610
20
Iron tube galvanized
104611
Slab Stand RR with tube length 1 meter.
Article number: 104741
Quantity
Designation
Article number
2
Perforated rail galvanized
104610
20
Iron tube galvanized
104612
Slab Stand RR with tube length 1.5 meter.
Article number: 104742
Quantity
Designation
Article number
2
Perforated rail galvanized
115158
20
Iron tube galvanized
115160
Slab Stand Bison with tube length 1.5 meter.
Article number: 115161
Quantity
Designation
Article number
2
Perforated rail galvanized
108588
16
Iron tube galvanized
107418
Slab Stand MAGNUM with tube length 1.2 meter.
Article number: 108590
Quantity
Designation
Article number
2
Perforated rail galvanized
108588
16
Iron tube galvanized
108589
Slab Stand MAGNUM with tube length 1.5 meter.
Article number: 107419