Installation and Connection
CFW11W | 2-10
Figure 2.12: Output links of the UP11; output connections to the motor [mm(in)]
Use two cables in parallel, with the recommended gauge indicated in the, for connecting the UP11 output
reactor to the output bus bar (motor connection).
Table 2.6: Output cables
Current (A)
Voltage (V)
Duty
Minimum Cables
Cross-Section (mm2)
700
380-480
ND
(2x) 240
515
HD
(2x) 150
640
500-690
ND
(2x) 240
477
HD
(2x) 150
The screw used to fasten the grounding cable of the UP11 is M12X30 (recommended torque: 60 N
∙
m), refer to