![Weco HeSU UNIVERSAL 5K3 Product Manual Download Page 9](http://html1.mh-extra.com/html/weco/hesu-universal-5k3/hesu-universal-5k3_product-manual_949485009.webp)
WeCo - HeSU UNIVERSAL MODEL 5K3 UNIVERSAL STACKABLE
HeSU 5K3-R20 STACKABLE * HIGH CURRENT V_2.00_2019
Pag. 9
5 System Installation
The battery is packed in a carton box, the total weight exceed 5
2
Kg, is mandatory the presence of two persons during the unpacking
operations and preliminary check, and a mechanical lift to carry and handle the modules.
5.1 Installation notice
a) Before installation, check the battery open circuit voltage, do not install with closed circuit
b) Battery installation location should be away from heat and avoid produce spark. The safety distance should be above than 20 m.
c) Battery installing connecting cables should be as short as possible, to prevent excessive line pressure drop.
d) Batteries with different capacity, different P/N or different manufactures are not allowed for connection.
e) Before conducting the battery, the battery positive and negative poles need to be carefully checked as well to ensure correct
installation.
f) The mounting floor should be horizontal.
5.2 Package information and system configuration list
The
battery
box
is
packed
in
cartons,
and
the
components
assort
with
the
battery
case.
When
you
confirm
the
goods,
please
read
t
he
configuration
list
carefully
to
make
sure
that
the
battery
box
and
kit
are
intact.
5.2.1 Configuration list of -HESU- SERIES (BATTERY PARALLEL).
Number
System capacity
-HESU- 5,3
1
Single Battery pack
1
2
Up to 5 units in parallel
5x5.3kWh
3
Up to 5 units per cluster for a total of 25 units
5x5x5,3kWh