TRC66-86 *** 32
3.2 Maintenance Survey
Any maintenance work which must be performed on the compactor is listed in two charts. The first chart
(paragraph 3.2.1) indicates the initial maintenance work which has to be carried out once at a certain time
after commissioning. The routine maintenance work indicated in the second chart (paragraph 3.2.2) has to
be repeated at regular intervals.
Both charts have the same lay-out. The column "Maintenance Interval" indicates the time or the operating hours
at which (after which) the maintenance work must be done.
The column "Maintenance Point " refers to the assembly group on which the work indicated in the column
"Maintenance Work" must be carried out.
The column "Remarks/Notes" contains cross-references on paragraphs of these operating and maintenance
instructions or other documentation in which the maintenance work is described in detail.
In case of extreme or very dusty operating conditions, the maintenance intervals must be
shortened accordingly!
3.2.1 Initial Maintenance
Maintenance
Interval
Maintenance
Point
Remarks/
Notes
After the first 25
operating hours
Hydraulic system
- Replace the hydraulic oil filter
# 3.3.5
Whole machine
- Check all screwed
connections for tight fit,
retighten them if necessary
Engine
- Change the engine oil
# 3.3.1
- Change the oil filter
# 3.3.2
- Check the coolant level
# 2.4.3
Maintenance Work
Summary of Contents for TRC 66
Page 2: ...TRC66 86 2...
Page 51: ...TRC66 86 51 5 Diagrams 5 1 Electric Diagram...
Page 53: ...TRC66 86 53 5 2 Hydraulic Diagram...
Page 57: ...TRC66 86 57...
Page 59: ...TRC66 86 59...