TRC66-86 *** 17
2.3 Commissioning
Caution!
During the first 50 operating hours, the engine must be operated at 70 % of its maximum load only.
Commissioning requires normal pre-start work only.
Keep to the initial maintenance intervals (refer to paragraph 3.2.1).
2.4 Pre-Start Work
- Check the whole compactor for evident damage,
eliminate visual damage.
- Check all threaded connections for a tight fit, retighten
them if necessary.
- Check the fuel level, add fuel if necessary (refer to
paragraph 2.4.1).
- Check the engine oil level and add engine oil if necessary
(refer to paragraph 2.4.2).
- Check the hydraulic oil level and add hydraulic oil if
necessary (refer to paragraph 2.4.4).
- Check the coolant level in the compensation vessel and
add coolant if required (refer to paragraph 2.4.3).
- Check the proper function of the controls and safety
devices (refer to paragraph 2.4.5).
- Check the charge of the sender accumulator (2.4.6).
- Fit the remote control unit (2.4.7).
2.4.1 Checking the Fuel Level
- Put the compactor out of operation as described in
paragraph 2.9.
- Unlock the hood (3/1).
- Open the flap (3/2).
- Open the fuel tank cap (4/1) and add clean diesel fuel
(refer to paragraph 3.4 for quantity and specifications)
up to the bottom edge of the filler neck.
Danger !
Take care that fuel does not come in contact with
hot engine parts. Extinguish all open flames and
do not smoke while refueling.
Carefully wipe up any spilled fuel.
Firmly replace the filler cap (4/1).
- Close the flap (3/2).
- Lock the hood (3/1).
Figure 3
Figure 4
1
1
2
Summary of Contents for TRC 66
Page 2: ...TRC66 86 2...
Page 51: ...TRC66 86 51 5 Diagrams 5 1 Electric Diagram...
Page 53: ...TRC66 86 53 5 2 Hydraulic Diagram...
Page 57: ...TRC66 86 57...
Page 59: ...TRC66 86 59...