www.wayne-dalton.com
827802-0001 Rev -
5
SECTION 2 - INSTALLATION
SITE PREPERATION
NOTE: Check that the fl oor, jamb, and
header are level, square, and plumb. If
they are not, you will need to add shims as
necessary. A laser lever is highly recomended
for this job.
NOTE: Mark the fl oor in three places to help align
the guides that will be placed in the following step.