![Waygate Technologies Krautkramer USM Go Operating Manual Download Page 49](http://html.mh-extra.com/html/waygate-technologies/krautkramer-usm-go/krautkramer-usm-go_operating-manual_878369049.webp)
Connecting a probe
3 Initial start-up
USM Go
Rev. 10 (06/2021)
3-9
3.3 Connecting a probe
To prepare the USM Go for operation, you have to con-
nect a probe to it. Any Waygate Technologies probe can
be used for the USM Go, provided the appropriate cable
is available and the operating frequency is within an ad-
equate range.
ATTENTION
If a probe is connected incorrectly, the con-
sequence would be a mismatching which
may lead to considerable power losses or
even to echo waveform distortions.
The probe is connected to the sockets on the side of the
instrument casing.
Both connector sockets are equally suitable (connected
in parallel) for connecting probes equipped with only
one ultrasonic element (ultrasonic transducer) so that it
does not matter which one of the two sockets is used.
When connecting a dual-element (TR) probe (having
one transmitter or pulser element and one receiver ele-
ment) or two probes (of which one is transmitting and
the other one receiving), attention should be paid to the
correct allocation of connecting cables (please see sym-
bols on the instrument):
Icon
Meaning
Pulser connection
Receiver connection
Summary of Contents for Krautkramer USM Go
Page 1: ...Krautkrämer USM Go USM Go Operating Manual Id No 49 155 Rev 10 06 2021 ...
Page 5: ...USM Go Rev 10 06 2021 0 5 Second operating level ...
Page 6: ...0 6 Rev 10 06 2021 USM Go Second operating level continued ...
Page 10: ...0 10 Rev 10 06 2021 USM Go ...
Page 20: ...0 10 Rev 10 06 2021 USM Go ...
Page 21: ...USM Go Rev 10 06 2021 1 1 Introduction 1 ...
Page 35: ...USM Go Rev 10 06 2021 2 1 Standard package and accessories 2 ...
Page 41: ...USM Go Rev 10 06 2021 3 1 Initial start up 3 ...
Page 53: ...USM Go Rev 10 06 2021 4 1 Principles of operation 4 ...
Page 76: ...4 Principles of operation Saving the settings 4 24 Rev 10 06 2021 USM Go ...
Page 77: ...USM Go Rev 10 06 2021 5 1 Operation 5 ...
Page 210: ...5 Operation Evaluation according to the DGS method 5 134 Rev 10 06 2021 USM Go ...
Page 211: ...USM Go Rev 10 06 2021 6 1 Documentation 6 ...
Page 240: ...6 30 Rev 10 06 2021 USM Go ...
Page 241: ...USM Go Rev 10 06 2021 7 1 Maintenance and care 7 ...
Page 247: ...USM Go Rev 10 06 2021 8 1 Interfaces and Peripherals 8 ...
Page 251: ...USM Go Rev 10 06 2021 9 1 Appendix 9 ...
Page 266: ...9 16 Rev 10 06 2021 USM Go ...
Page 267: ...USM Go Rev 10 06 2021 10 1 Specifications 10 ...
Page 278: ...10 12 Rev 10 06 2021 USM Go ...