DOC-0002
Hardware Installation Manual
Page 1: ...DOC 0002 Hardware Installation Manual...
Page 2: ...respective owners The use of the word partner does not imply a partnership relationship between Wave2Wave and any other company The limited warranty for the accompanying product is set forth in the Wa...
Page 3: ...ROME 9 3 1 Installation Preparation 9 3 2 Unpacking ROME 10 4 Installing the ROME Chassis 11 4 1 Mounting the ROME Chassis 11 4 2 Mounting the Patch Panel 12 4 3 Cabling Fiber and Ground 13 5 Install...
Page 4: ...To ensure safety all configurations of the rack cabinet must be certified by a nationally recognized testing laboratory in order to verify compliance with country specific safety regulations This pro...
Page 5: ...e made first and disconnected last Avoiding Circuit Overload Overloading a circuit is potentially a fire hazard and a shock hazard under certain conditions To avoid these hazards 1 Take care when conn...
Page 6: ...des the following 2 1 Parts List 2 ROME slider rail units for mounting ROME Chassis 1 Set of ROME Positioning Rulers 2 each for WECO and EIA racks 1 Clearance Level Tool Jig to ensure proper clearance...
Page 7: ...sis 2 3 Installing Slider Rail Units Follow the steps below to install the ROME slider rail units on a four post rack Prior to continuing please make absolutely sure that the safety guidelines from se...
Page 8: ...he rack Use the jig by placing it on the 2 extended slider arms a Check right to left leveling using a level adjust sliders front brackets as needed b Run the jig between the 2 sliders from the front...
Page 9: ...ration Before beginning the installation of ROME equipment please make sure to Wear an ESD strap Have a mechanical lifting device available such as the one pictured which is required to lift and maneu...
Page 10: ...he outside of the package and make sure they re not activated red If either indicator is red stop the process and contact Wave2Wave 4 After the box is unpacked inspect the internal shock watch indicat...
Page 11: ...ar mount the first ROME unit on the lowest set of sliders Continue to mount ROME units from the bottom up Two people are recommended for this step of the process 1 Move the ROME Chassis to the lift 2...
Page 12: ...de the ROME Chassis into the rack 11 Secure the ROME to the front rack screwing the ears to the rack 4 2 Mounting the Patch Panel Sufficient cable length is provided to mount the patch panel in the fr...
Page 13: ...end the ROME Chassis outwards for maintenance 4 3 2 Grounding the ROME Chassis Connect the customer facility ground to the ROME Chassis at the attachment point which is located at the lower left corne...
Page 14: ...by plugging in both power cables 5 1 Mounting the LCU The LCU mounting kit comes with two L brackets ears which are attached to the front of the LCU chassis and extension brackets in the back that is...
Page 15: ...nnector to the bottom signal box using the provided labels on the signaling Y cable If it is not connected correctly ROME will not operate The signaling cable from the LCU to the ROME Chassis should b...
Page 16: ...es 15P to C15 SJT 14AWG and plug in to turn on the ROME For other regions different power cables may be provided The LCU front panel has three LEDs These LEDs provide a quick visual indication of the...
Page 17: ...NAME UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN MILLIMETERS SURFACE FINISH TOLERANCES LINEAR ANGULAR Q A MFG APPV D CHK D DRAWNYONATAN ROME Side View Dimensional Details mm 30 32in 770mm 31 14in 79...
Page 18: ...715 2mm 27 49in 698 2mm 17 48in 444 in 16 93in 430mm 17 44in 443mm 1 73in 44mm G 29 39in 745 5mm 16 93in 430mm 28 16in 715 2mm 27 49in 698 2mm 17 48in 444 in 16 93in 430mm 17 44in 443mm 1 73in 44mm G...
Page 19: ...4 98in 126 6mm Appendix 3 Patch Panel Dimensions Appendix 4 Console Cable Pinout Signals and Pinouts for the Console RJ 45 to DB 9 Serial Cable Console Cable Pinout Console Port PC COM Port RJ 45 DB 9...
Page 20: ...0 Hz 4A per PSU 48 60 Vdc 8A per PSU Power Consumption 55W Standby 150W 180W Peak While Switching Environmental Conditions Temperature Range operating 0 C to 40 C 32 F to 104 F Temperature Range stora...
Page 21: ...d found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equ...
Page 22: ...1RU 1 71in U S Headquarters 47775 Fremont Blvd Fremont CA 94538 phone 1 408 586 8800 Contact Innovate Design Manufacture...