background image

Need help with your installation?

Our team is available from 0900 to 1700, Monday to Friday, Sydney time.

Support phone: 

02 8316 7540

 (+61 2 8316 7540 from overseas)

Support: To lodge a Support ticket, please visit our Support Portal at  

www.wattwatchers.com.au/support

Support

S018019   Quick Start Guide - A6M

2. Connect 

your Audit

or 

continued

WW 018020   Quick Start Guide - A6W

 

Size (

 amps) 

Opening Width 

(mm)

60                                           

10

120                                         

16

200                                         

22.5 (opens 180 

degrees

)

400                                         

25

600

36

CT Dir

ection 

Install Curr

ent Transf

ormers (CTs) such tha

t: 

 

•  For grid monit

oring: arro

w is from grid

•  For solar monit

oring: arro

w is from in

vert

er

•  For load monit

oring: arro

w is to

war

ds the load. 

About the split-cor

e CTs:

•  Only W

attw

atchers-supplied CT

s are support

ed

• All CT s 

can be inter

changed in the field (in sets of 3)

•  Diff

erent-siz

ed CT s can be used 

on one 

devic

e, in sets 

of three

 

eg. channels 1-

3, 60 Amps; 

channels 4-6, 400 Amps

•   CT

 sizes 

can be changed using the 

onboarding t

ool in step 3

 

onboarding.

wattw

atchers.

com.au

 

Directional arr

ow

s for CT

 placement ar

e imprinted 

on the CT s.

CT siz

es and opening apertur

e widths

Summary of Contents for Auditor 6W

Page 1: ...e connections are labelled P1 P2 P3 N Connect voltage phases to P1 P2 and P3 Connect neutral to N Use three phase wiring tails if they were provided with your Auditor Single Phase Voltage Connections...

Page 2: ...For load monitoring arrow is towards the load The CT connections are labelled 6 5 4 3 2 1 The white wires connect to terminals labelled three wires in each terminal The pink wires connect to the termi...

Page 3: ...that Current Transformer can accommodate the cable size i e cable diameter fits within CT opening width Ensure there is a way to isolate the Auditor voltage inputs An existing or new circuit breaker...

Page 4: ...that Current Transformer can accommodate the cable size i e cable diameter fits within CT opening width Ensure there is a way to isolate the Auditor voltage inputs An existing or new circuit breaker...

Page 5: ...e connections are labelled P1 P2 P3 N Connect voltage phases to P1 P2 and P3 Connect neutral to N Use three phase wiring tails if they were provided with your Auditor Single Phase Voltage Connections...

Page 6: ...400 25 600 36 Current Transformer Direction Install Current Transformers CTs such that For grid monitoring arrow is from grid For solar monitoring arrow is from inverter For load monitoring arrow is...

Page 7: ...white wires connect to terminals labelled three wires in each terminal The pink wires connect to the terminals labelled The CTs and Voltage phases must match as stated below Place CT connected to On...

Page 8: ...unicate over the internet using the household WiFi the network name and password is required This allows the Wattwatchers energy device to send and receive data over the homeowner s internet link Any...

Page 9: ...T size Log into the onboarding tool and work through the steps to configure your devices for the installation site Wattwatchers WiFi Setup Page 2 of 2 5 Whilst connected to the Wattwatchers device s n...

Page 10: ...tor should be lit solid The table below shows the meaning of the lights Auditor 6W Indicators L1 Mode L2 Network L3 Internet Explanation Blink Off Off No WiFi network Code started Blink Blink Off Foun...

Page 11: ...s ve and expected value on all circuits Grid and load CTs are installed correctly Ensure CT phase and orientation are correct CTs on the wrong phase may cause negative PF readings Where there is solar...

Page 12: ...tor should be lit solid The table below shows the meaning of the lights Auditor 6W Indicators L1 Mode L2 Network L3 Internet Explanation Blink Off Off No WiFi network Code started Blink Blink Off Foun...

Page 13: ...the onboarding tool and work through the steps to configure your devices for the installation site Wattwatchers WiFi Setup Page 2 of 2 5 Whilst connected to the Wattwatchers device s network open a w...

Page 14: ...ees 400 25 600 36 CT Direction Install Current Transformers CTs such that For grid monitoring arrow is from grid For solar monitoring arrow is from inverter For load monitoring arrow is towards the lo...

Reviews: