Check the Contents

Check the contents of this package. If any of the contents listed are missing or damaged, please refer to the Limited 

Warranty and Product Return Procedure on the back of this brochure and contact your wholesaler or tekmar

®

 sales 

representative for assistance. Type 089 includes:
•  One pressure sensor bulb
•  One 10 foot electrical cable with connector

•  One Installation and Operation Manual IOM-T-089

Preparation

Tools Required

•  22 mm or Crescent wrench

•  Flathead screwdriver

Materials Required

•  Pipe joint compound or PTFE tape
•  1/4" steam gauge siphon (pigtail) 

•  1/4" to 

1

8

" FIPS reducing coupler

Installation Location

•  The Pressure Sensor 089 must be installed downsteam 

of a 1/4" steam gauge siphon (pigtail) to prevent premature 

failure.

•  Keep dry. Avoid potential leakage onto the sensor.

Step 1 – Rough In Wiring

•  The sensor cable is 10 feet (3 m) in length. This can 

be extended up to 100 feet (30 m) using 3-conductor 

18 AWG solid or stranded cable. The cable is color 

coded with black, red and green wire jackets.

•  Strip wire to 

3

8

" (10 mm) for all terminal connections.

As with any electrical product, care should be taken to 

guard against the potential risk of fire, electric shock, 

and injury to persons.

Step 2 – Mounting

•  Apply pipe joint compound or PTFE tape to the  

sensor threads.

•  Thread sensor into the tee. Tighten with wrench.
•  Connect the cable to the sensor using the Metri-Pack 

electrical connector.

•  Should the cable need to be disconnected from the 

sensor bulb, use a flathead screwdriver to release the 

electrical connector spring-loaded clip.

Step 3 – Wiring

Conduit Connector

•  Pull wires through a conduit as required by electrical 

codes.

Terminating

•  Terminate the black conductor to the control’s  

power common.

•  Terminate the red conductor to the control’s 5 V(dc) 

reference voltage.

•  Terminate the green conductor to the control’s ratiometric 

signal input.

Summary of Contents for tekmar 089

Page 1: ...re of a hydronic system between 0 to 15 psi 0 to 089 kPa The sensor bulb is designed to install into a tee using 1 8 27 NPT threads and includes a 10 foot 3 m long cable Please read carefully before p...

Page 2: ...ant Safety Information 3 Installation 4 Check the Contents 4 Preparation 4 Installation Location 4 Step 1 Rough In Wiring 4 Step 2 Mounting 4 Step 3 Wiring 4 Testing and Troubleshooting 5 Technical Da...

Page 3: ...sult in death or serious injury This symbol identifies hazards which if not avoided could result in minor or moderate injury This symbol identifies practices actions or failure to act which could resu...

Page 4: ...h In Wiring The sensor cable is 10 feet 3 m in length This can be extended up to 100 feet 30 m using 3 conductor 18 AWG solid or stranded cable The cable is color coded with black red and green wire j...

Page 5: ...ires The voltage signal should be between 0 5 to 4 5 V dc Using the lookup table below compare the measured voltage to a mechanical pressure gauge mounted on the hydronic system The signal should be a...

Page 6: ..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Page 7: ...Pa Operating Temperature Range 40 to 257 F 40 to 125 C Burst Pressure 450 psi Acceptable Fluid Media Water glycol solution steam Dimensions 0 87 x 2 3 L 22 0 mm x 58 5 mm L cable 10 feet 3 0 m Threads...

Page 8: ...arranty with its customers Any representations or warranties about the Products made by Purchaser to its customers which are different from or in excess of the tekmar Limited Warranty are the Purchase...

Reviews: