Section 4: General Piping Guidelines
L-OMM-0003_A
• 10/8/2021 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
24
of
157
4.2 Building Return Piping
Figure 11
– Element Example Installation
4.3 Flow Requirements
The pressure drop across Element from cold inlet to hot and mixed outlets is negligible due to the
internal booster pump. Minimum flow capacity is a C
V
of 5.8 during a building power outage.