![Waterworks Exeter Series Installation Instructions Download Page 1](http://html1.mh-extra.com/html/waterworks/exeter-series/exeter-series_installation-instructions_3696141001.webp)
RECOMMENDED TOOLS AND MATERIALS
Putty Knife
Regular Screwdriver
Adjustable Wrench
Sealant
Tape Measure
Hacksaw
Wax Ring/Gasket
Supply Tube
Closet Bolts
Carpenters Level
1
REMOVE OLD TOILET
a.
Close toilet supply valve and flush tank completely. Towel or sponge remaining water from tank and bowl.
b.
Disconnect and remove supply line. NOTE:
If replacing valve, first shut off main water supply!
c.
Remove old mounting hardware, remove toilet and plug floor waste opening to prevent escaping sewer gases.
d.
Remove closet bolts from flange and clean away old wax, putty, etc. from base area.
NOTE:
Mounting surface must be clean and level
before
new toilet is installed!
CAUTION: PRODUCT IS FRAGILE. TO AVOID BREAKAGE AND POSSIBLE
INJURY HANDLE WITH CARE!
NOTE:
Pictures may not exactly define contour of china and components.
!
To ensure this product is installed properly, please read these instructions carefully before you begin.
(Certain installations may require professional help.) Also be sure your installation conforms to local codes.
INSTALLATION INSTRUCTIONS
For Exeter 2-Piece Water Closets
2
ROUGHING-IN DIMENSIONS:
ELONGATED (EXWA40)
ROUND FRONT (EXWA36)
18-7/8"
C/L OF SEAT POST
MTG HOLES ON
5-1/2" CTRS
16-5/8"
28-1/2"
8-3/8"
1 1/4"
6-1/2"
13-5/8"
11-1/4"
31-1/4"
C/L OF SUPPLY
AS REQUIRED
FINISHED
FLOOR
FINISHED WALL
1/2"
3-1/2"
12"
18-3/4"
15"
C/L
6"
8"
C/L OF OUTLET AND
TOILET MTG BOLTS
*
*
16-7/8"
C/L OF SEAT POST
MTG HOLES ON
5-1/2" CTRS
26-3/8"
8-3/8"
6-1/2"
13-5/8"
FINISHED WALL
1/2"
3-1/2"
12"
C/L OF OUTLET AND
TOILET MTG BOLTS
1 1/4"