Cleaning the extraction cone
4-43
3. Rotate the 2 PEEK extraction cone retainer clips to secure the extraction
cone, then use the combined 2.5-mm Allen wrench and cone extraction
tool to tighten the retainer clip securing screws.
Fitting the ion block assembly to the source assembly
Required materials
•
Chemical-resistant, powder-free gloves
•
Combined 2.5-mm Allen wrench and cone extraction tool
To fit the ion block assembly to the source assembly
1. Fit the ion block assembly to the PEEK ion block support.
2. Use the combined 2.5-mm Allen wrench and cone extraction tool to fit
and then slowly tighten the 4 ion block assembly securing screws
sequentially and in small increments.
3. Open the source isolation valve (see
).
4. Close the source enclosure.
Warning:
The source components can be contaminated with
biohazardous and/or toxic materials. Always wear
chemical-resistant, powder-free gloves while performing this
procedure.
Warning:
To avoid puncture wounds, take great care while working
with the source enclosure open, because the ESI probe tip is sharp.
Warning:
To avoid puncture wounds, take great care while working
with the source enclosure open if one or both of these conditions apply:
• An ESI probe is fitted (the probe tip is sharp).
• A corona pin is fitted (the pin tip is sharp).
Caution:
To avoid recontaminating the ion block assembly, wear clean
chemical-resistant, powder-free gloves during this procedure.
Summary of Contents for Xevo TQD
Page 12: ...xii...
Page 20: ...xx Table of Contents...
Page 23: ...Uses and compatibility 1 3 Xevo TQD TP03406...
Page 24: ...1 4 Specifications and Operating Modes Xevo TQD with visor up TP03407...
Page 42: ...1 22 Specifications and Operating Modes...
Page 52: ...2 10 Preparing for Operation...
Page 76: ...3 24 Changing the Mode of Operation...
Page 194: ...4 118 Maintenance Procedures...
Page 208: ...A 14 Safety Advisories...
Page 234: ...B 26 External Connections...
Page 238: ...C 4 Materials of Construction and Compliant Solvents...
Page 250: ...Index 8...