![Waters Xevo TQ-XS Mass Overview And Maintenance Manual Download Page 171](http://html1.mh-extra.com/html/waters/xevo-tq-xs-mass/xevo-tq-xs-mass_overview-and-maintenance-manual_3666255171.webp)
Tip:
Part numbers are embossed on the shrink-wrap below the ferrule assembly. You must
disconnect the line from the source to see the part number.
4.29.1 Removing a fluidic line
Required Materials
• Chemical-resistant, powder-free gloves
• Flat-blade screwdriver
• T10 TORX driver
Warning:
To avoid personal contamination with biohazards, toxic materials, and corrosive
materials, wear chemical-resistant gloves when performing this procedure.
Warning:
To avoid electric shock, ensure that the instrument is prepared for working
on the source before commencing this procedure.
To remove a fluidic line:
1.
Prepare the instrument for working on its source (see
Prepare the instrument for working
).
Warning:
To avoid burn injuries, take great care while working with the probe
and source; these components can be hot.
2.
Open the ionKey source front cover and remove the iKey surround.
June 9, 2016, 715004990 Rev. A
Page 171