
Connecting the workstation
C-21
Connecting the workstation
Before connecting the workstation to the instrument, set up the workstation
according to its accompanying instructions. Locate the workstation within
5 meters (16 feet) of the instrument.
Requirement:
Use shielded network cables with the mass spectrometer to
ensure compliance with FCC limits.
To connect the workstation
1. Connect the monitor to the PC.
2. Connect one end of the shielded network cable to the appropriate port on
the rear panel of the mass spectrometer.
3. Connect the other end of the shielded network cable to the port labeled
instrument LAN on the workstation rear panel.
To connect the instrument to the power source
1. Select the appropriate power cord for your location.
2. Connect the female end of the power cord to the power port on the rear
panel of the instrument.
Caution:
Do not connect the instrument’s power supply cord until you
complete the installation procedures in the previous sections.
Summary of Contents for Xevo TQ MS
Page 10: ...x...
Page 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 129: ...Replacing the air filter 4 81...
Page 130: ...4 82 Maintenance Procedures...
Page 146: ...B 4 Materials of Construction and Compliant Solvents...
Page 178: ...D 4 Plumbing the IntelliStart Fluidics system...