
3-4
Configuring the LockSpray Source
ESI probe, mounted on the LockSpray source enclosure:
4. Tighten the probe locking ring to secure the probe in place.
Tip:
An automatic pressure test is performed when the probe is correctly
seated in position.
5. Connect the ESI probe’s cable to the high voltage connector.
6. Open the access door to the IntelliStart Fluidics system (see the figure
).
7. Using a long “finger-tight” fitting, connect 0.004-inch ID (or greater)
tubing, from port 2 (the top port) of the diverter valve to the ESI probe,
where you use a PEEK, “finger-tight” nut and ferrule to connect to the
union.
Caution:
To avoid nitrogen leakage, fully tighten the probe locking
ring.
Warning:
To avoid electric shock, do not use stainless steel tubing
to connect the diverter valve to the ESI probe; use the PEEK
tubing supplied with the instrument.
TP03128
ESI probe cable
ESI probe
Vernier probe adjuster
Probe locking ring
Source window
High voltage connector
Source enclosure
release
Vertical probe
adjuster
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...