
Replacing the ESI probe sample capillary
5-71
11. Unscrew the finger-tight PEEK union from the UNF coupling.
12. Remove the ferrule and PTFE liner sleeve from the capillary.
13. Remove the capillary from the UNF coupling.
14. Dispose of the capillary, PTFE liner sleeve, and ferrule in accordance
with local environmental regulations.
Installing the new capillary
Required materials
•
Chemical-resistant, powder-free gloves
•
Combined 2.5-mm Allen wrench and cone extraction tool
•
10-mm wrench
•
Needle-nose pliers
•
LC pump
•
HPLC-grade (or better) 1:1 acetonitrile/water
•
Capillary
•
Ferrule
•
Seal
•
PTFE liner tubing
•
Conductive sleeve
•
Red PEEK tubing
Warning:
The capillary, PTFE liner sleeve, and ferrule can
be contaminated with biohazardous and/or toxic materials.
Dispose of them according to local environmental
regulations.
Ferrule
PTFE liner sleeve
Summary of Contents for Xevo G2 QTof
Page 10: ...x...
Page 18: ...xviii Table of Contents...
Page 34: ...1 16 Waters Xevo G2 QTof Overview...
Page 44: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 227: ...Connecting the liquid waste line B 17 Positioning of drain tube TP01807 Correct Incorrect...
Page 238: ...B 28 External Connections...
Page 242: ...C 4 Materials of Construction and Compatible Solvents...
Page 248: ...Index 6...