
Preparing the IntelliStart fluidics system
2-11
Diverter valve positions
Column and syringe in home position after power-up
After power-up, the flow path between the column and waste is open. The
syringe is empty, and the flow path between it and waste is open.
LC position
In the LC position, the flow path between the LC and probe is open, and the
flow path between the syringe and waste is also open.
Column
Waste
LC
Waste
Probe
Syringe
Idle
Reservoir A
Reservoir B
Off
Off
B
A
Column
LC
LC
Waste
Probe
Syringe
Idle
Reservoir A
Reservoir B
Off
Off
B
A