
Installing the optional Post-column Addition kit
September 26, 2013, 715004208 Rev. A
61
•
The optical detector outlet tubing, ISM filter outlet tubing, and
Convergence Manager tee inlet tubing are supplied in the splitter
kit.
12. Reconnect the finger-tight fittings to the outlet and inlet of the degasser.
Installing the optional Post-column Addition kit
On an ACQUITY UPLC, ACQUITY UPLC H-Class, ACQUITY UPLC I-Class,
or Alliance system, install the Post-column Addition kit in the ISM to modify
the composition of mobile phase entering the QDa detector. Doing so
facilitates ionization of compounds that are relatively nonpolar. The kit
Inlet 1:
From optical
detector
Outlet 2:
To Convergence
Manager tee
Inlet 2:
From ISM
filter
Outlet 3:
To QDa detector
source
Outlet 4:
To third
detector
Degasser
outlet
Degasser
inlet