Installing the HPLC Pump
Site requirements
Install the 1500-series pump at a site that meets the specifications indicated
in the following table.
Installation site requirements
Factor
Requirement
Temperature
4 to 40 °C
Relative humidity
20 to 80%, noncondensing
Bench space
Width: 43 cm, including bottle holder (58 cm
with column heater)
Depth: 61 cm
Height: 43 cm
Vibration
Negligible
Clearance
At least 15 cm at rear, for ventilation and
cable connections
Static electricity
Negligible
Input voltage and
frequency
Grounded AC, 120/240 VAC, 50/60 Hz,
single phase
Electromagnetic
fields
No nearby source of electromagnetic noise,
such as arcing relays or electric motors
Power requirement 200 VA for pump
150 VA for column heater
Caution:
To avoid overheating and to provide clearance for cable
connections, ensure there is at least a 15-cm clearance at the rear of the
pump.
Summary of Contents for 1500-Series
Page 14: ...xiv Table of Contents ...
Page 32: ...1 18 Introduction ...
Page 50: ...2 18 Installing the HPLC Pump ...
Page 84: ...3 34 Installing Options and Accessories ...
Page 108: ...4 24 Preparing for Operation ...
Page 160: ...A 14 Safety Advisories ...
Page 184: ...C 16 Solvent Considerations ...