Safety considerations
Some reagents and samples used with Waters instruments and devices can
pose chemical, biological, and radiological hazards. You must know the
potentially hazardous effects of all substances you work with. Always follow
Good Laboratory Practice, and consult your organization’s safety
representative for guidance.
Considerations specific to the TQ Detector IVD
Solvent leakage hazard
The source exhaust system is designed to be robust and leak-tight. Waters
recommends you perform a hazard analysis, assuming a maximum leak into
the laboratory atmosphere of 10% LC eluate.
Flammable solvents hazard
Never let the nitrogen supply pressure fall below 690 kPa (6.9 bar, 100 psi)
during analyses that require flammable solvents. Connect to the LC output
with a gas-fail connector to stop the LC solvent if the nitrogen supply fails.
Warning:
• To confirm the integrity of the source exhaust system, renew
the source O-rings at intervals not exceeding one year.
• To avoid chemical degradation of the source O-rings, which
can withstand exposure only to certain solvents (see
), determine whether any solvents you use that are
not listed are chemically compatible with the composition of
the O-rings.
Warning:
To prevent the ignition of accumulated solvent vapors inside
the source, maintain a continuous flow of nitrogen through the source
whenever significant amounts of flammable solvents are used during
the instrument’s operation.
Warning:
To avoid unmanaged solvent spillage do not place tools
or other objects in the drain channel on the probe top. Keep the
channel free from blockages.
Summary of Contents for TQ
Page 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Page 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Page 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Page 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Page 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...