2 Preparing for Operation
36
December 6, 2012, 71500126802IVD Rev. C
Starting the instrument
The Waters TQ Detector is designed for compatibility with the ACQUITY
UPLC system. If you are not using an ACQUITY UPLC system, refer to the
documentation relevant to the system being used.
Starting the instrument entails powering-on the ACQUITY workstation,
logging into the workstation, powering-on the TQ Detector and all the other
ACQUITY instruments and devices, and starting the MassLynx software.
Requirement:
You must power-on and log in to the ACQUITY workstation
first to ensure that it obtains the IP addresses of the system instruments.
To start the instrument
1. Ensure the nitrogen supply is connected to the instrument’s API gas
connection.
Requirement:
The nitrogen must be dry and oil-free, with a purity of at
least 95%. Regulate the supply at 600 to 690 kPa (6.0 to 6.9 bar, 90 to
100 psi).
For more information on connections, see the figure on
.
2. Ensure that the collision gas supply is connected to the instrument.
Requirement:
The collision gas is argon; it must be dry and of high
purity (99.9%). Regulate the supply at 50 kPa (0.5 bar, 7 psi).
3. Power-on the ACQUITY UPLC system workstation, and log in before
powering-on the other instruments.
4. Press the power switch on the top, left-hand side of the instrument and
ACQUITY instruments.
Caution:
Using incompatible solvents can cause severe damage to the
instrument. For more details, refer to the following sources:
•
, for solvent information.
• Appendix C of the
ACQUITY UPLC System Operator’s Guide
for on
solvent compatibility with ACQUITY™.
Warning:
During analyses that require flammable solvents, to avoid
ignition of the solvents, never let the nitrogen supply pressure fall
below 690 kPa (6.9 bar, 100 psi).
Summary of Contents for TQ
Page 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Page 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Page 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Page 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Page 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...