
Connecting the oil-filled roughing pump
December 6, 2012, 71500126802IVD Rev. C
159
Connecting the oil-filled roughing pump
Note:
To connect the alternative dry roughing pump, see
Required materials:
•
Chemical-resistant, powder-free gloves
•
7-mm nut driver
•
8-mm Allen wrench
•
Sharp knife
•
1-L exhaust trap bottle (included in the startup kit)
•
Elbows (included in the Waters Rough Pump Connect Kit)
•
NW25 tee (included in the startup kit)
•
NW25 center rings (included in the startup kit)
•
NW25 clamps (included in the startup kit)
•
PVC exhaust tubing (included in the Waters Rough Pump Connect Kit)
•
PVC hose clamps (included in the Waters Rough Pump Connect Kit)
•
1-inch ID vacuum hose (included in the Waters Rough Pump Connect
Kit)
TP02689
Oil filler plug
Oil-level sight glass
Drain plug
Gas ballast valve
Exhaust port flange
Summary of Contents for TQ
Page 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Page 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Page 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Page 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Page 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...