
2-2
Setting up the Detector
Introduction
The following figure shows the major steps in installing the detector.
Major steps in installing the detector
Before you begin
Requirement:
To install the detector, you should know how, in general, to set
up and operate laboratory instruments and computer-controlled devices and
also how to handle solvents.
Make Signal
Connections to
Start installation
procedure
Installation
complete
Select
appropriate
site
Unpack and
inspect
Make power
connections
Make signal
connections to
other devices
Place 2424 ELS
detector in desired
location
Make liquid line
connections
Make waste and
venting connections
Make gas
connections
Fill siphon with
mobile phase
Install nebulizer
Summary of Contents for 2424
Page 8: ...viii...
Page 30: ...1 16 2424 ELS Detector Optics Principles...
Page 64: ...2 34 Setting up the Detector...
Page 110: ...3 46 Operating the Detector...
Page 126: ...4 16 Maintaining the Detector...
Page 182: ...A 14 Safety Advisories...
Page 186: ...B 4 Specifications...
Page 196: ...Index 10...